Negotiable
The date of payment from buyers deliver within days
Jiangxi
Long-term effective
2022-03-13 15:44
143
Company Profile
Wuhan GDMK Electric Co., LtdBy certification [File Integrity]
Contact:gdmk2020(Mr.)
Email:
Telephone:
Phone:
Area:Jiangxi
Address:Jiangxi
Website:http://www.mktester.com/ http://gdmk2020.bathroomfriend.com/
Product description:
Designed according to the requirements of the equipment, it is widely used in the AC withstand voltage test of the 35-220kV series voltage transformer of the power system to evaluate the main transformer from the insulation strength and the winding of the motor and the motor. Small transformer. Induction test; can also be used as a 150Hz short-time power supply.
Technical parameter:
Input voltage Three-phase 380V 50Hz sine wave
Input current 7.6A
Output voltage Single phase 0~500V / 0~1000V (continuously adjustable) Frequency: 150Hz
Output current 5A
Output capacity 5kVA
No-load running time ≤5 minutes
Load running time 40 seconds
Product features:
1 Tri-frequency transformer operation is simple and reliable
2 Can well meet the needs of transformer withstand voltage transformer
3. It is widely used in voltage transformer frequency multiplication induction withstand voltage test;
4. Carry out phase splitting and frequency doubling induction withstand voltage test on power transformers;
5. Perform frequency multiplication induction withstand voltage test on electrical products such as receiving induction coils.
6. By adjusting the induction quantity of the iron core gas change device, a large-capacity test product can be designed;
7. There is no transient overvoltage when the test product is broken down;
8. A wide range of applications, large field applications, and a large range of test product capabilities;
9. When the test product fails, the flowing lithium will automatically fall into the eyes due to the destruction of the temper, and short-circuit a small current through the fault point;
10. The support device can be used as a pressure test. Pressure devices and transformers sense the need for withstand voltage.
Q&A:
What should I do if the tri-frequency induction withstand voltage device has overcurrent or breakdown?
1. The factory setting of the over-current protection we tested is 80% of the rated output current. When used for a small load, it should be re-adjusted according to the actual situation of the load;
2. When over-current or breakdown occurs during the boost process, the industry adopts three-frequency induction withstand voltage, and the over-current protection action can protect the product under test and prevent the accident of the product under test from expanding. Cut off the input three-phase power to prevent damage to the three-frequency power generation device.
http://www.mktester.com/